Saturday, December 24, 2016

New Home updates

So,
     We closed on our new house on Nov. 22.  It was built in 1992, and needed some updating. So, since we had some money left from the sale of our old house, we decided to update.

Here is the kitchen before:

With it's white tile .......ugh!   Here it is mid-project:

And here it is with the new Quartz counter top and new deeper (love it) stainless steel sink.  We still want to paint the cabinets, but that's a large job for later:

Next up was the kids bathroom.  We decided to rip out the old vanity (so ugly) with it's seashell sinks and all.  We also tore out the extra shelf above the toilet and replaced the mirror and faucet. In doing all this, we also now need to replace the flooring since the old tile doesn't cover the whole floor anymore.  We'll be doing that at the beginning of the year. But for now, here is the before and after.





and finally.....the Master bath (my personal favorite).  We kept the vanity but replaced the counter top with a white/black quartz, replaced the seashell sinks with new modern square ones, replaced the faucets, drawer pulls, and changed the mirror into 2 separate ones.  Lastly, we decided to paint the vanity a grey color to match.  Here it is before and after:




Til Next Time-

RTSZAW